Main Terrace

Project Description: The Main Terrace renovation project provided design and planting for existing landscape beds at the President's Suite Terrace. These beds included one outside the President's Office and one off of the Stark Library. The project included removing all existing sod and soil as well as shrubbery from the west terrace and removing shrubbery, and a sculpture from the east terrace. All waterproofing in the deck and sod areas was replaced, and artificial turf was installed in the former sod areas. The project also installed new lighting around the perimeter of all raised areas and included providing some additional power capabilities.

Focus Area: Research & Science

Project Cost: $258.7K

Project Completion: December 2019