Skip to main content
utexas.edu
Campus Operations and Planning
Menu
Close
Main navigation
Services
More Services pages
Requesting Service with UT Works
Planning, Design and Construction Services
Planning, Design and Construction Project Highlights
Integrated Planning and Design
Replacement & Renewal (R&R)
Reporting a Construction Safety Issue
Technical Review
Planning
UT Dig Safe
Client Resources
More Client Resources pages
Why Planning, Design & Construction
Project Process
Relocation Information
Warranty Assistance
Frequently Asked Questions (FAQ)
Landmarks
Operations Support
Building Manager Resource Guide
Status of My Requests
Sustainability
Approved Rates & Fees
FY 26 Rates
Vendor Resources
More Vendor Resources pages
Construction and Professional Services Contracts Transparency Report
Working With Us
Proposal Solicitation Resources
HUB Services
Construction Coordination
Bidding & Contracting
Formal Solicitation Opportunities
Printing Plans and Specs
Design & Construction Standards
More Design & Construction Standards pages
CAD Templates
Changelog & Alerts for DCS Versions
DCS Versions
Deliverables
Standard Detail Drawings
Design Basis
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Woods, Plastics, Composites
Division 07 - Thermal & Moisture Protection
Division 08 - Openings (Door Hardware)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Constructions
Division 14 - Elevators
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating, Ventilating & Air Conditioning
Division 26 - Electrical
Division 27 - Distributed Communication Systems
Division 28 - Electronic Safety & Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Standards Exceptions
Construction Advisory
More Construction Advisory pages
Main Building and Tower Restoration Updates
TxDOT I-35 Capital Express Central Project
102-147: Football Training Complex
102-1618: Construction Activity at Medical Arts St and Dean Keeton St
AT&T Tunnel System Leak
CP965210: GOL West Patio Waterproofing
Carl J. Eckhardt Heating and Power Plant: Boiler Replacement
East Campus Garage HVAC Renovations
East Mall Improvements
Hal C. Weaver Power Plant Boiler Replacement
JES Dock Concrete Spalling Repairs
Peter Flawn Academic Center (FAC) Roof Replacement
102-1347 Engineering Discovery Building
Bellmont Hall Renovation
102-1422 Mulva Hall
CP1003754 WCP: Whitis Courts Residence Hall
About Us
More About Us pages
Join Our Team
Contact Us
Leadership Team
News
Recognition
Search
Breadcrumb
Home
MSH BRK-CP1012309-26CSP003-Bid Tab.pdf
MSH BRK-CP1012309-26CSP003-Bid Tab.pdf
File
MSH BRK-CP1012309-26CSP003-Bid Tab.pdf
(97.68 KB)