26CSP006 CS3 CP2000534 - Structural and Electrical Repairs

Project Body

Project Summary

The abbreviated Summary of Work is as follows:

Central Chilling Station No. 3 CS3

Differential settlement of the exterior equipment yard foundation with respect to the CS3 main building is occurring, which is stressing multiple rigid connections such as conduits, bus ducts, and piping between the structures.

Two (2) 7.5MVA transformers and two (2) associated 12kV metal enclosed switchgear currently resting in the equipment yard will be removed in separate phases during construction and reinstalled on new foundations, while CS3 continues to operate. The transformers will be tested by the contractor prior to temporary removal. The subcontractors employed to complete new micropile foundations will be crucial to overall project success.

The remaining area of the transformer enclosure will be designed as an open space with a new canopy roof of similar design to the existing. The existing wall enclosing the yard shall remain, but a section of the wall between two columns on the western face will be removed to facilitate construction operations and be replaced with a steel access gate. The entire project will be designed to be installed in two phases, to ensure CS3 normal operation during construction.

The selective demolition, replacement and new construction consists of, but is not limited to, the following as indicated on the Drawings: 
a.    Structural selective demolition of concrete foundations, roof canopy, and masonry walls.
b.    Structural concrete installation of equipment foundations, pilecaps, micropiles, and miscellaneous flatwork. 
c.    Civil selective demolition for asphaltic and concrete paving, sidewalks, roadways, curbs and other features.  
d.    Civil excavation, grubbing, grading, paving and utility line extensions and replacements for damaged, relocated or removed utilities.
e.    Electrical selective demolition and repairs. 
f.    Electrical underground and overhead raceways and cabling. 
g.    The rigging, testing, storage, installation, and reconnection of the existing equipment and materials. 
h.    Testing of all equipment.     
 

Project Details:

  • RFP Number: 26CSP006
  • CP Number: CP2000534
  • Project Manager: Logan Golla
  • Professional Service Provider: Burns Engineering Contact: Darrell Widner
  • Contract Specialist: Lana Beranek

Key Dates:

  • Notice to Proposers Out: June 3, 2026
  • Pre-Submittal Conference: June 12, 2026 10:00 A.M. via Teams Meeting

Join: https://teams.microsoft.com/meet/21243545402529?p=6Pj9aIKH2ypxcKJJYf  
Meeting ID: 212 435 454 025 29 
Passcode: Rt7ut3Vr 
Dial in by phone 
+1 512-831-7901,,535774522# United States, Austin 
Find a local number 
Phone conference ID: 535 774 522#

A link to the sign-in sheet for attendance will be provided in the Teams meeting chat the day of the Pre-proposal meeting on 6/12/2026.  


•    Pre-Submittal Conference Date: June 12, 2026   Time: 10:00 A.M.
•    Initial Site Visit: Date: June 12, 2026  Time: 1:00 P.M. 
•    2nd Site Visit: Date: June 17, 2026 10:00 A.M. 

A link will be provided on this site the day of the 2nd site visit. 

Deadline for questions/requests for clarification Date: June 23, 2026 Time: NOON


All questions and inquiries regarding this RFP must be submitted in writing via the U.T. Drop Box using the following link: https://utexas.app.box.com/f/f5062879ad8f40c98bef2e757248f353
 

A sign-in sheet link for attendance will be provided in the Teams meeting chat the day of the Bid Opening on 7/16/2026 at 11:00 A.M.  

Teams Meeting for Bid Opening:

Join: https://teams.microsoft.com/meet/24832655052419?p=7XnMGz7Bv9E7ir2l6b  
Meeting ID: 248 326 550 524 19 
Passcode: 6sz7ve94 
Dial in by phone 
+1 512-831-7901,,985728872# United States, Austin 
Find a local number
Phone conference ID: 985 728 872# 

 

No. of Addenda: 0

PDC Offices - Do Not Mail Envelopes. All submissions must be made via the links provided for the UT Drop Boxes.